Project overview
We prepared costings for a gravity-fed water supply from the Burdekin Dam to the Ross River Dam.
As part of a $1.2 billion project, our team has compiled costing reports including engineering sketches, engineering fees, and subsequent reports.
We are also providing additional engineering support to Local Government’s Joint Water Taskforce, such as:
- A review encompassing all relevant engineering documentation associated with bulk water supply options for the Townsville Urban Water Supply
- A high-level summary of engineering analysis, options analysis, risks identifications, and preliminary costings
- Assistance with scoping of additional engineering assessments
- Facilitation of further detailed reviews
Image courtesy of the Townsville Bulletin